POREM BIOACTIVATOR PREPARATION AT SOLDANO’s PREMISES (04/02/2019)
Use of poultry manure from laying hen, discharged by belts situated in bird recovery, where preliminary drying is carried out
And transport to the selected location for POREM bioactivator pilot production: covered, with a roof against rainfall, to maintain solid phases, preventing leakage, with aeration in order to use natural convection and with electric supply for process and gas monitoring and data acquisistionn
transport
Predisposition of basal LAYER or pile n.1
Treatment: VAP distribution
Covering of VAP (natural Enzyme preparation) and completing pile/heap 1 (about 3 tons)
Pile 2 and 3 preparation
The 3 piles